Project Specification
| Spec | Value |
|---|---|
| Acoustic performance | NRC 0.55 - 0.65 (WPC / SPC stone soft core) |
| Surface finish | Scrub-resistant PVC laminate, 6000+ taber rubs |
| Fire rating | ASTM E84 Class A · EN 13501-1 B-s1, d0 |
| Emission class | E0 formaldehyde (CARB Phase 2 compliant) |
| Cleaning | Bleach-cleanable, hospitality-grade |
| MOQ | 200 sqm per SKU |
| Lead time | 7 days production after deposit |
| Sample | A4 size, free, 3-5 working days to major port cities |
Recommended Series
Project Notes
Used by 3-star to 5-star chains across UAE, KSA, and Southeast Asia. Recent projects include 200-room renovation (Dammam), 120-room new-build (Da Nang).
Why ENIS Wall Panels
ENIS is a B2B-only manufacturer with a 150,000 m² production base, supporting FOB / CIF / DDP worldwide. Every batch is tested to ASTM E84 and EN 13501-1 fire ratings and shipped with 5 quality certificates.
Factory size
150,000 m²
Fire ratings
ASTM E84 Class A · EN 13501-1 B-s1, d0
Certifications
ISO 9001 · CE · ISO 14001 · FSC · SGS
Incoterms
FOB · CIF · DDP
FOB cities
Shenzhen / Foshan / Ningbo / Qingdao
Lead time
7 days after deposit
Regions
North America · Middle East · Europe · Southeast Asia
Sample
A4 size, free
Request a Quote · 24h Reply
Project area, target country, fire / waterproof requirement. We reply with FOB / CIF / DDP quote within 24 hours.
Frequently Asked Questions
- What fire rating does the hotel guest room wall panel meet?
- All hotel bedroom wall panels meet ASTM E84 Class A and EN 13501-1 B-s1, d0 fire-rating standards. Each batch is shipped with an SGS fire-rating certificate to support hotel permit approvals.
- How does the NRC 0.55-0.65 acoustic insulation work for hotel rooms?
- Our WPC, SPC and soft-stone cores are tested at NRC 0.55-0.65, which absorbs mid-to-high frequency sound from neighboring rooms and corridor traffic. This is the typical hotel-grade acoustic range specified by 4-star and 5-star operators.
- Can the panels handle hotel-grade cleaning chemicals?
- Yes. The PVC overlay is bleach-cleanable and rated for 6,000+ scrub cycles. Housekeeping can use standard hotel disinfectants without damaging the surface or color.
- What is the MOQ and lead time for a hotel project?
- MOQ is 200 sqm per SKU. Production lead time is 7 days after deposit confirmation. Sea freight from Shenzhen / Foshan / Ningbo / Qingdao to the destination port typically takes 18-30 days.
- Do you supply matching ceiling tiles and trim profiles?
- Yes. We supply matching ceiling panels, corner trims, end caps and skirting for a complete FF&E package, all from the same factory batch to ensure color and finish consistency.