首页 › 产品系列 › 金属配件 › Metal Trim · G16
G16-15 产品实物图

Metal Trim · G16

金属配件 · 型号 G16-15

$6.67/平方米
FOB 参考价 · 深圳 / 佛山 / 宁波 / 青岛
最小起订量200 平方米
交货周期7 天
规格尺寸Model 5501 5mm 收边条
产品厚度5mm
芯材铝型材
材质铝合金 + 多色喷涂(哑黑/哑金/玫瑰金/哑墨灰等)
包装方式标准出口纸箱(10-15 片/箱)+ 四角护角
认证ISO 9001 · CE · ISO 14001 · FSC · SGS
出运港口深圳 / 佛山 / 宁波 / 青岛
付款方式30% 电汇定金,70% 尾款于发货前付清

常见问题

关于 G16-15 —— 可以寄实物样品吗?
可免费提供 A4 样品;运费由买方承担,3-5 个工作日寄至主要港口城市。
最小起订量可以协商吗?
标准最小起订量为 200 片。特殊项目可放宽至 50% 起订量,价格相应上浮 8-12%。
交货周期如何计算?
定金到账后 7 天开始生产。标准订单 30-45 天抵达欧美及东南亚主要港口。
支持 OEM 定制包装吗?
支持。500 片起订可印客户 logo 与条码,外箱同步定制。
Application scenes

Where Metal Trim · G16 is installed.

Metal trim decides whether a clad wall looks engineered or improvised. Every junction, external corner and movement gap is a trim decision — and there are thousands of them.

01

Hotel Public Areas

High-traffic zones judged at first sight.
Metal Trim · G16 — Hotel lobby
Hotel lobby
Metal Trim · G16 — Guest room entrance
Guest room entrance
Metal Trim · G16 — Reception desk
Reception desk
Metal Trim · G16 — Elevator lobby
Elevator lobby
Metal Trim · G16 — Double-height lobby
Double-height lobby
02

Commercial & Public Buildings

Retail, office, healthcare and education projects.
Metal Trim · G16 — Boutique retail
Boutique retail
Metal Trim · G16 — Commercial foyer
Commercial foyer
Metal Trim · G16 — Business lounge
Business lounge
Metal Trim · G16 — Full-height glazing
Full-height glazing
Metal Trim · G16 — Urban development
Urban development
Metal Trim · G16 — Hospital lobby
Hospital lobby
Metal Trim · G16 — School corridor
School corridor
Installation detail

How Metal Trim · G16 goes in.

Section profile, joint geometry and the fixing method that make this product behave on site.

Metal Trim · G16 This SKU
01This SKU
Metal Trim · G16 Same-series variant
02Same-series variant
Metal Trim · G16 Same-series variant
03Same-series variant
01 Profiled to panel thickness

Reveals are cut to the actual board depth, not foam-filled on site.

02 Matched at source

Extruded in the same line as the panels, so finish batches stay consistent.

03 Replaceable section

A damaged length is cut out and swaged back without touching the panels.

Installation requirements

What the fitter needs on site.

Send these five points to the installer with the drawing. Claims outside them are not covered.

01 Fixing to panel

Trim clips engage the panel groove every 300 mm; never screw through the visible face.

02 Corner setting

External corners set with a consistent 1–2 mm reveal, checked with a string line.

03 Movement joints

A dedicated movement profile every 8–10 linear metres, filled with backing rod.

04 Site conditions

Cut with a fine-tooth blade; aluminium requires a deburring pass to remove burrs.

05 Acceptance

Straight run within 2 mm over 2 m; mitres closed; no visible fixing holes.

Figures are factory recommendations for standard conditions. Movement joint spacing, fixing centres and substrate tolerance always defer to the project specification and local code.