EB-230
SPC Wall Panel · SKU EB-230
| MOQ | 200 pcs · - m² |
|---|---|
| Lead Time | 7 days |
| Specs | 1220×2440/2600/2900mm |
| Thickness | 2.0/3.0/4.0mm |
| Core | 石晶板 |
| Material | PVC resin + active CaCO₃ + PVC additives |
| Packing | Standard export carton (10-15 pcs/ctn) + corner protectors |
| Certifications | ISO 9001 · CE · ISO 14001 · FSC · SGS |
| Ports | Shenzhen / Foshan / Ningbo / Qingdao |
| Payment | 30% T/T deposit, 70% balance before shipment |
- Regarding this EB-230 — can you send an actual sample?
- Free A4 samples provided; buyer covers shipping,3-5 working days to major port cities。
- Can MOQ be negotiated?
- Standard MOQ 200 pcs. Special projects can reduce to 50% MOQ with +8-12% price.
- How is lead time calculated?
- 7 days after deposit. Standard orders arrive at major EU/US/SEA ports in 30-45 days.
- Do you support OEM packaging?
- Yes. MOQ 500 pcs to print customer logo + barcode.
Frequently Asked Questions
Where EB-230 is installed.
SPC wall panel is the default wherever water is present. A rigid calcium-stone core and a click-lock carrier make it the most stable wall covering we ship.
Wet Areas
Continuously wet zones requiring sealed joints.


Hotel Guest Rooms
Where guests touch the product every single night.





Hotel Public Areas
High-traffic zones judged at first sight.




How EB-230 goes in.
Section profile, joint geometry and the fixing method that make this product behave on site.



Panels bond to a matching backer rail, so the wall floats independently of the substrate.
The core is solid stone composite — it cannot delaminate or absorb water at the joint.
Sanitary corners and penetrations are sealed with a neutral silicone, not grout.
What the fitter needs on site.
Send these five points to the installer with the drawing. Claims outside them are not covered.
Steel framing or cement board, moisture content ≤8 %, flatness within 2 mm over 2 m.
Click-lock rail plus full-bed tile adhesive, or dot-fix at ≥40 % coverage on dry walls.
Wet zones: flexible joint every 6 linear metres. Dry zones: every 10 metres.
No installation below 5 °C. Conditioning 48 h at 18–25 °C before bonding.
Same-batch panels only. Adjacent panels from different dye lots are rejected on site.
Figures are factory recommendations for standard conditions. Movement joint spacing, fixing centres and substrate tolerance always defer to the project specification and local code.









