PE Outdoor · H180
PE Outdoor · SKU H180
| MOQ | 200 pcs · - m² |
|---|---|
| Lead Time | 7 days |
| Specs | Various sizes |
| Thickness | 25-30mm |
| Core | PE |
| Material | PE polyethylene + UV anti-aging |
| Packing | Standard export carton (10-15 pcs/ctn) + corner protectors |
| Certifications | ISO 9001 · CE · ISO 14001 · FSC · SGS |
| Ports | Shenzhen / Foshan / Ningbo / Qingdao |
| Payment | 30% T/T deposit, 70% balance before shipment |
- Regarding this PE Outdoor · H180 — can you send an actual sample?
- Free A4 samples provided; buyer covers shipping,3-5 working days to major port cities。
- Can MOQ be negotiated?
- Standard MOQ 200 pcs. Special projects can reduce to 50% MOQ with +8-12% price.
- How is lead time calculated?
- 7 days after deposit. Standard orders arrive at major EU/US/SEA ports in 30-45 days.
- Do you support OEM packaging?
- Yes. MOQ 500 pcs to print customer logo + barcode.
Frequently Asked Questions
Where PE Outdoor · H180 is installed.
PE decking is specified wherever the surface meets sun, rain and salt. It holds colour through the seasons and stays slip-resistant when wet.
Exterior & Semi-Exposed
Facade, terrace and covered walkway conditions.




Commercial & Public Buildings
Retail, office, healthcare and education projects.






How PE Outdoor · H180 goes in.
Section profile, joint geometry and the fixing method that make this product behave on site.



Hidden clips engage the board groove, so there are no screw heads on the walking face.
Boards run on a joist frame with a ventilated cavity beneath.
Brushed or grooved faces are laid across the traffic direction.
What the fitter needs on site.
Send these five points to the installer with the drawing. Claims outside them are not covered.
Aluminium or PE joists at 400 mm centres over concrete, or 500 mm over steel deck.
Minimum 1:80 fall away from the building; 1:100 preferred for large terraces.
15 mm ventilated gap at all perimeters and 8 mm at skirtings, never sealed.
Ambient 5–40 °C. Boards acclimatised 48 h; no installation on frozen or wet sub-base.
Full clip engagement on every board; no unsupported spans over 400 mm.
Figures are factory recommendations for standard conditions. Movement joint spacing, fixing centres and substrate tolerance always defer to the project specification and local code.