首页 › 产品系列 › PE 户外地板 › PE Outdoor · S140
S140-23 产品实物图

PE Outdoor · S140

PE 户外地板 · 型号 S140-23

$11.75/平方米
FOB 参考价 · 深圳 / 佛山 / 宁波 / 青岛
最小起订量200 片
交货周期7 天
规格尺寸多种规格可选
产品厚度25-30mm
芯材PE 聚乙烯
材质PE 聚乙烯 + 抗老化 UV
包装方式标准出口纸箱(10-15 片/箱)+ 四角护角
认证ISO 9001 · CE · ISO 14001 · FSC · SGS
出运港口深圳 / 佛山 / 宁波 / 青岛
付款方式30% 电汇定金,70% 尾款于发货前付清

常见问题

关于 S140-23 —— 可以寄实物样品吗?
可免费提供 A4 样品;运费由买方承担,3-5 个工作日寄至主要港口城市。
最小起订量可以协商吗?
标准最小起订量为 200 片。特殊项目可放宽至 50% 起订量,价格相应上浮 8-12%。
交货周期如何计算?
定金到账后 7 天开始生产。标准订单 30-45 天抵达欧美及东南亚主要港口。
支持 OEM 定制包装吗?
支持。500 片起订可印客户 logo 与条码,外箱同步定制。
Application scenes

Where PE Outdoor · S140 is installed.

PE decking is specified wherever the surface meets sun, rain and salt. It holds colour through the seasons and stays slip-resistant when wet.

01

Exterior & Semi-Exposed

Facade, terrace and covered walkway conditions.
PE Outdoor · S140 — Urban development
Urban development
PE Outdoor · S140 — Full-height glazing
Full-height glazing
PE Outdoor · S140 — Glazed entrance
Glazed entrance
PE Outdoor · S140 — Retail showroom
Retail showroom
PE Outdoor · S140 — Glazed corridor
Glazed corridor
02

Commercial & Public Buildings

Retail, office, healthcare and education projects.
PE Outdoor · S140 — Boutique retail
Boutique retail
PE Outdoor · S140 — Commercial foyer
Commercial foyer
PE Outdoor · S140 — Business lounge
Business lounge
PE Outdoor · S140 — Full-height glazing
Full-height glazing
PE Outdoor · S140 — Urban development
Urban development
PE Outdoor · S140 — Hospital lobby
Hospital lobby
PE Outdoor · S140 — School corridor
School corridor
Installation detail

How PE Outdoor · S140 goes in.

Section profile, joint geometry and the fixing method that make this product behave on site.

PE Outdoor · S140 This SKU
01This SKU
PE Outdoor · S140 Same-series variant
02Same-series variant
PE Outdoor · S140 Same-series variant
03Same-series variant
01 Clipped to a sub-frame

Hidden clips engage the board groove, so there are no screw heads on the walking face.

02 Ventilated sub-frame

Boards run on a joist frame with a ventilated cavity beneath.

03 Grooved slip surface

Brushed or grooved faces are laid across the traffic direction.

Installation requirements

What the fitter needs on site.

Send these five points to the installer with the drawing. Claims outside them are not covered.

01 Sub-frame

Aluminium or PE joists at 400 mm centres over concrete, or 500 mm over steel deck.

02 Fall

Minimum 1:80 fall away from the building; 1:100 preferred for large terraces.

03 Perimeter

15 mm ventilated gap at all perimeters and 8 mm at skirtings, never sealed.

04 Site conditions

Ambient 5–40 °C. Boards acclimatised 48 h; no installation on frozen or wet sub-base.

05 Acceptance

Full clip engagement on every board; no unsupported spans over 400 mm.

Figures are factory recommendations for standard conditions. Movement joint spacing, fixing centres and substrate tolerance always defer to the project specification and local code.